Problem: The low-cement castable that was installed in situ wore too quickly. The poor service life required downtime for emergency repairs to be made between planned outages....

Problem: End user had regularly scheduled reline maintenance and wanted to reduce the length of the shutdown....

Germany +49 (151) 53179621 Holger.schmidt@thermbond.com...

Problem: Spalling of existing lining happened after just a few months, reducing service time of furnace....

Problem: Scheduled thermal imaging showed excessive hot spots in the FCC unit in various locations. Emergency refractory repairs were required to replace areas of damaged refractory....