APPLICATION REPORT
Power Plant Coal Boiler
Industry: Power Generation Description of Equipment: Peep doors, thermocouple ports, and water cannon ports Problem: Repairs needed to be made with minimal downtime Solution: Use Thermbond products that require no curing or lengthy dryout
|
Power Generation Coal Boiler - Water
Cannon port repaired with Formula 6P |
Repair over old refractory in either peep
sites or thermocouple openings |
 |
 |
Repairing area over 4" thick with
Formula 15 R |
Trowling Formula 6P inside a Power Coal
Boiler around a water cannon port |
Product Being Replaced: Conventional Ram Refractory
Products Applied: Formula 6 P and Formula 15 R
Method of Installation: Equipment Used: Pnemautic ramming hammer and 3/4 hp drill with mixing blade.
Scope of Work: Mixed Formula 15R with hand mixer. Rammed material into place over existing refractory. Installer was pleased with the consistency. Initially Formula 6P was mixed into a thin trowelling consistency.The trowelling cosistency worked well for thin overlays. Additional batches were mixed so the Formula 6P could be made into a ball (like for ramming). The material was spread out on plywood to slow down the setting time. Unused material was moved and stored in an area where the temperature was 65F, as opposed to keeping the material in the boiler where temperatures were 95-100F, as they had done prior. This extended the working time for Formula 6P pleased the installers.
Installation Date: October 2007