APPLICATION REPORT
Industrial Boiler, European Refinery- Ramming
Industry: Major European Refinery
Description of Equipment: Industrial Boiler
Problem: Installing new burners, burner throats, and refractory lining on the sidewall.
Solution: Ramming Formula 15 R for the burner throats and sidewall refractory
|
|
|
|
|
Burner situation |
Ramming Formula 15-R |
Sidewall partly finished |
Product Being Replaced: Conventional Refractory
Savings Using Thermbond: A reduction in downtime because of Thermbond's ability to be heated up very rapidly and longer life because of Thermbond superior thermal shock resistance.
Products Applied: Formula 15 R
Method of Installation: Ramming with pneumatic hammers.
Equipment Used: Holbart Mixer
Scope of Work: Install Formula 15 R in eight burner throats and over 18 square meters of finned tube sidewalls.
Installation Date: April 2007
Follow Up: The same type of installation was performed at the refinery in August 2007. An inspection of both installations in November 2008 boiler revealed the burners and sidewalls of Formula 15 R were still in excellent condition.
|