Coal Fired Power Boiler- Gunned, Rammed, Cast

 
 

Thermbond Refractories

 

APPLICATION REPORT

IndustryMinerals Processing Industry- Plant Power Boiler
 
Description of Equipment
Coal Fired Power Boiler- Western US

ProblemMinimize downtime during plant outage. Refractory cure-out and dry-out are the bottleneck 

SolutionGun, ram, and cast appropriate Thermbond product in wet bottom ash hopper, wind box, and burner throats.

 

One wall of wet bottom ash hopper
gunned with Formula 6 AG

Wind box to be cast with Formula 8B

an insulating Thermbond product

Placing Formula 15R by hand before

Ramming into place with bench rammer
Burner throats near completion
 
Product Being Replaced: Conventional castable refractories
 
Savings Using Thermbond: Approximately 3 days of downtime eliminated and over $60,000 in gas costs for longer, more controlled, firing in required for conventional refractories. 
 
Products Applied: Formula 6AG was gunned 9 inches thick in the entire bottom ash hopper. Formula 8B was installed in the burner wind boxes, and Formula 15R was rammed into the burner throats.

 
Method of Installation: Gunning, ramming, and casting.

Scope of Work: The minerals processing customer who owns the power plant previously used Thermbond for time saving and performance benefits on a much smaller scale and specified it for this outage.  Nearly 30 pallets of Thermbond were installed during this outage.  A large, well known, refractory contractor from California performed the tear-out, anchor placement, and refractory installation.  Their knowledge of Thermbond products was instrumental in meeting the deadline set by the customer.  The ash hopper was completely relined with 9” of Formula 6AG. Rebound rates averaged between 10-15% depending on the crew and location in the ash hopper being gunned.  Formula 8B, an insulating castable, was chosen to line the wind boxes attached to the burners.  The wind box mixes preheated air before it is fed into the burners. Finally Formula 15R was rammed into 8- 4’ diameter burner throats.

 

The work was completed on time and the customer put the boiler back into operation without any problems.  It was a very successful Thermbond installation and the customer intends to use Thermbond on future outages.


Installation Date: July 2008
 
If you would like additional information regarding this application report, please contact Brendan Gallagher @:  Mobile: (520)906-2407, Email: brendan.gallagher@thermbond.com
 
To view this application report in a pritable format, please click here
 

Last modified at 2/4/2010 4:20 PM  by Ashley Garcia