Skip to main content
www.thermbond.com

Thermbond in the Refining and Petrochemical Industry

Go Search
Home
  
THERMBOND: Experience The Best. > Thermbond in the Refining and Petrochemical Industry > Thermbond in HPI > Other HPI Installations  

Other HPI Installations

 
THERMBOND HPI INSTALLATIONS
OTHER HPI INSTALLATIONS
 

Location

Application

Material

Quanitity

Start Date

End Date

Installations

Corpus Christi, TX

Ultraformer Reactor Heads (5)

Formula 18G

18 Tons

4/1/1999

.

Other HPI Installations

Baton Rouge, LA

Thermal Oxidizers (2) complete with Breeching

Thermbrake 403G  Formula 6AG

292 Tons

4/1/2000

.

Other HPI Installations

Corpus Christi, TX

Hydrogen Charge Heater- Center Baffle Wall

Formula 6P

26 Tons

12/1/2000

.

Other HPI Installations

Worldwide

Transfer Line Exchangers (TLE's) and Headers

Formula 6L

100+ Tons

1/1/2001

10/1/2008

Other HPI Installations

Joliet, IL

Low-Nox Burner Project- Heater Floors

Thermbrake 403 Formula 9BL

60 Tons

1/1/2002

1/1/2003

Other HPI Installations

Wilmington, CA

Low-Nox Burner Project- Heater Floor

Formula 8B

4 Tons

1/1/2003

.

Other HPI Installations

Bakersfield, CA

Process Heater Floor

Formula 8B

8 Tons

3/1/2003

.

Other HPI Installations

Baytown, TX

Hydroformer and Crude Pipe Still- Heater Floors

Formula 8B

90 Tons

1/1/2003

1/1/2004

Other HPI Installations

Houston, TX

Magnaformer- Vessel Side Wall behind Shroud

Formula 6AG

42 Tons

10/1/2004

.

Other HPI Installations

Wilmington, CA

Coke Calciner- Kiln Kooler

Formula 6L

14 Tons

8/1/2005

.

Other HPI Installations

Martinez, CA

Hydrogen Plant- Transfer Line and Tube Sheet

Thermbrake 403G Formula 18G Formula 18BL

4.5 Tons

2/1/2007

.

Other HPI Installations

Martinez, CA

Sludge Thermal, Oxidizer- Walls and Roof

Formula 6AG

20 Tons

12/1/2007

.

Other HPI Installations

Carson, CA

Sludge Thermal, Oxidizer- Walls and Roof

Formula 6AG

16 Tons

3/1/2008

.

Other HPI Installations

Freeport, TX

Hot Wall Reactor- Vessel Side Walls

Formula 2112R

25 Tons

4/1/2008

.

Other HPI Installations

Coffeyville, KS

Gasification Reactor- Gasifier Back Up

Formula 18BL Formula 18R

8 Tons

5/1/2008

.

Other HPI Installations

 

 

Last modified at 6/18/2009 4:37 PM  by Ashley Garcia