Skip to main content
www.thermbond.com

Thermbond in the Refining and Petrochemical Industry

Go Search
Home
  
THERMBOND: Experience The Best. > Thermbond in the Refining and Petrochemical Industry > Thermbond in HPI > Fluid Coker Installations  

Fluid Coker Installations

 
THERMBOND HPI INSTALLATIONS
FLUID COKER INSTALLATIONS
 

Location

Application

Material

Quanitity

Start Date

End Date

Installations

Baytown, TX

Flexicoker Heater- Top of Dense Bed and Below Grid Quench Tee

Formula 8G Formula 16G

26 Tons

5/1/2008

.

Fluid Coker

Benecia, CA

Fluid Coker Cyclones, Hot Coke Riser Line

Formula 12L Formula 6L

14 Tons

2/1/2002

.

Fluid Coker

Sarnia, Canada

Fluid Coker Seal Pot Repairs

Formual 6AG

1 Ton

6/1/2005

.

Fluid Coker

Baytown, TX

Flexicoker Gasifier- 2400 Sq ft of Wall Area above Grid 8" Thick

Formula 8G

120 Tons

2/1/2006

.

Fluid Coker

Baytown, TX

Flexicoker Heater- Below Grid Inverted Conical Wall

Formula 5AG

12 Tons

2/1/2006

.

Fluid Coker

Rotterdam, Netherlands

Flexicoker Gasifier- Above Grid Wall Repairs

Formula 8G

60 Tons

7/1/2006

.

Fluid Coker

Martinez, CA

Flexicoker Heater

Formula 9AG Formula 5AG

1.5 Tons, 1.5 Tons

9/1/2006

.

Fluid Coker

Delaware City, DE

Fluid Coker- Nozzle Shields on Coke Riser Lines

Formula 12L

1.5 Tons

4/1/2008

.

Fluid Coker

Baytown, TX

Flexicoker Heater- Quench Section Side Walls Below Dense Bed

Formula 2125 G

14 Tons

9/1/2008

.

Fluid Coker

 

 

Last modified at 6/18/2009 4:30 PM  by Ashley Garcia